go to top scroll for more

Projects


Projects: Projects for Investigator
Reference Number WPDT1009
Title Electric Boulevards
Status Completed
Energy Categories Energy Efficiency(Transport) 25%;
Other Power and Storage Technologies(Electricity transmission and distribution) 75%;
Research Types Applied Research and Development 100%
Science and Technology Fields ENGINEERING AND TECHNOLOGY (Electrical and Electronic Engineering) 100%
UKERC Cross Cutting Characterisation Not Cross-cutting 100%
Principal Investigator Project Contact
No email address given
Western Power Distribution
Award Type Network Innovation Allowance
Funding Source Ofgem
Start Date 01 February 2013
End Date 01 March 2015
Duration ENA months
Total Grant Value £550,000
Industrial Sectors Power
Region South West
Programme
 
Investigators Principal Investigator Project Contact , Western Power Distribution (100.000%)
Web Site https://smarter.energynetworks.org/projects/WPDT1009
Objectives The project has defined the following objectives: Infrastructure will be installed to provide connection to three IPT chargers in the Milton Keynes area using a number of different arrangements HV and LV monitoring will be installed before and after IPT charger commissioning in order to determine the change in harmonic levels A smart wired charging system will be created to return the vehicles to a full state of charge overnight whilst ensuring the network is operating within its rated capacity.
Abstract ARUP and MITSUI are leading a joint-venture to determine the technical and commercial feasibility of decarbonising an existing public transport route around Milton Keynes with the introduction of a number of pure electric buses. The conventional diesel powered buses currently servicing this route will be entirely replaced by an electric bus fleet developed by Wright Bus and will be operated by Arriva. This will be the first scheme in the UK to replace an existing fleet with electric multi-passenger vehicles. A capacity of 120kVA is required to deliver sufficient charge to the bus within the short window of time it will be waiting at a bus-stop. A linear load of this size should be able to be supplied by the low voltage system in most cases without thermal ratings being exceeded, however the non-linear equipment used in the IPT system is likely to cause high levels of harmonic voltage distortion. Engineering Recommendation G5/4 sets the planning levels for harmonic voltage distortion to be used in the process for the connection of non-linear equipment and LV equipment creating disturbance levels outside of this would need to be connected at HV, increasing the cost and acting as barrier to uptake.
Publications (none)
Final Report (none)
Added to Database 15/12/22